(everyone knows roading budgets usually blow out - the total final cost of Transmission Gully appears to be $2.5bn – double the projected cost of $1.25bn).
(everyone knows roading budgets usually blow out - the total final cost of Transmission Gully appears to be $2.5bn – double the projected cost of $1.25bn).
$2320 per cm; or $232 per mm
Thanks
That’s absolutely insane. Imagine if that was the number in the proposed plan. Would have been squashed instantly